References

The CEO have completed important projects and experiences in all areas of the energy sector, engineering, manufacturing and construction, especially specialized in oil & gas, petroleum & petrochemicals, power generation and industrial facility construction projects.


Project management of MED based on experience, technology and modern management techniques with all necessary quality systems. Procurement is another activity that the management is specialized and experienced in. Management leads the projects with their respective disciplines.

Some completed projects by Mr. Imad ABDULLATIF References:

ULUABAT HEPP (2x52MW V. Francis) Turbine & Generator electromechanical erection Coordinator (2011-2012)

KALKANDERE HEPP (3x16 MW H. Francis) Turbine & Generator electromechanical erection Coordinator (2011)

DARICA HEPP (2x52MW V. Francis) Generator electromechanical erection Project Manager (2012)

AKKÖY II HEPP (2x112MW V. Pelton) Turbine & Generator electromechanical erection Coordinator (2009-2010)

EŞEN II (2X25MW V. Francis) Maintenance of turbines and Generators Project Manager (2015)

ARKUN HEPP (3x80 MW V. Francis) Electromechanical installation of Turbine & Generator, MBOP Basic design and detail design, supply, installation and commissioning. Leader and Coordinator (2010-2012)

ALPASLAN II HEPP (2x110MW + 2X30MW V. Francis) Electromechanical installation of Turbine & Generator, MBOP Basic design and detail design, supply, installation and commissioning. Coordinator and Lead Designer (2014-2015)

SHUAKHEVİ HEPP (2.89.358MW V. Francis) Electromechanical installation of Turbine & Generator, MBOP Basic design and detail design, supply, installation and commissioning. Coordinator and Lead Designer (2014-2016)

Head of tendering of EM installation and MBOP scope of hydropower plants and CCPP

YEDİGÖZE HEPP (2x165 MW V. Francis) Electromechanical installation of turbines and generators, MBOP detail design, supply, installation, test and support in commissioning. Project Coordinator and Lead Designer (2009-2010)

ENERJİSA Kavşakbendi (3x60.85MW V.Francis),Köprü (2x72.5MW V.Francis), Menge (2x42.5MW V.Francis) Kopru and Menge HEPP Mechanical BOP, Detail Design supply and installation of Turbine & Generator and electromechanical erection coordinator and Lead designer (2008-2013)


DERINER HEPP (4x165 MW V.Francis) Generator erection Deputy Project Manager (2008-2009)

ENOVA Oskan (3x8MW H. Kaplan) and Berkman (3x14MW H. Kaplan) HEPP partial supply, electromechanical erection Coordinator (2007-2009)

CEVİZLİK HEPP (2x50MW V. Francis) partial supply and electromechanical erection of turbine and generator. Project Manager (2007-2008)

UZUNDERE HEPP (2x32MW V. Pelton) electromechanical erection of turbine and generator. Project Manager (2007)

DARENHES Seyrantepe HEPP (2x28MW V. Francis) Mechanical BOP material supply mechanical erection / Project Manager (2006-2008)

AKKÖPRÜ HEPP (2x50 MW V. Francis) Turbine & Generator Mechanical Erection Deputy Project Manager (2007-2008)

BOSEN AALBORG boiler mechanical installation, piping, instrumentation and insulation Project Manager (2007)

RIETER / SWİSSTEX, Manufacturing, installation and support in commissioning of textile steel structures in Turkey and Syria. Project Manager (2002-2006)

ZORLU KAYSERİ 163.2 MW CCPP, three GE LM6000 gas turbines, three AALBORG steam generators, one SIEMENS steam turbine mechanical installation, instrumentation, piping, cooling tower pumps and piping, insulation Project Manager (2004-2005)

ZORLU Çorlu CCPP Dismantling of DESA boiler and transfer to Kayseri BİRLİK Mensucat, installation and insulation Project Manager (2004)

BİRLİK MENSUCAT Cogeneration power plant installation of one gas turbine 6MW, instrumentation, piping and insulation. Project Manager (2004)

GAMA AYEN CCPP construction of a natural gas fired combined cycle power plant, comprising GE (USA) LM2500 PY+DLE double shaft aeroderative gas turbine, Thermodyn (France) steam turbine and Aalborg Engineering (Denmark) HRSG (generating 30 tons/hr. of high pressure and 7 tons/hr. of low pressure steam), including all auxiliary components., mechanical installation, piping, instrumentation and insulation Site Engineer /Deputy Project Manager (2003-2004)

KIRIKKALE MOBILE PP (13x10 MW WARTSILA Fuel oil generator motors ,4 GAMA HRSG and one SIEMENS steam turbine. DENOX & DESOX systems. Mechanical installation, instrumentation, piping and insulation Site Engineer /Deputy Site Manager (2000-2001)

EŞEN II HEPP (2X25MW V. Francis) electromechanical installation Site Engineer/Deputy Site Manager (2001-2002)

PAMUKOVA HEPP (3x3.5MW H. Kaplan) electromechanical installation Site Engineer / Site Manager (1999)

BERKE HEPP (3x175 MW V. Francis) Turbine and inlet valve erection Site Engineer (1999-2000)

BİRECİK HEPP (6x112MW V. Francis) Mechanical installation Site Engineer. Deputy Site Manager (1998-1999)

ERDEMİR PLATE MILL installation, piping and mechanical erection Project Engineer (2004-2006)

ERDEMİR 4.TH LIME STONE FACTORY mechanical erection engineer (1998)